ALERTs:  There are no alerts at this time   | Read More ...
City of Washburn
  • I want to...
    • Get Permit / License
    • Join Committee
    • Pay For
    • Report Problem
    • Reserve a Facility
    • Visit Washburn
    • Vote
  • City Government
    • Contact
    • Agendas & Minutes
    • City Council
    • Finance
    • City Ordinances & Zoning Code
    • Committees & Commissions
    • Historical Preservation Commission
    • Public Safety >
      • Police
      • Fire & Ambulance
    • Employment Opportunities
    • Mayor
    • Parks & Campgrounds
    • Public Works & Utilities
    • Recreation
  • Services
    • BART Rural Transit
    • Cemetery
    • Permits
    • Library
    • Marina
    • Trash and Recycling
    • Yard Waste Site
    • Bids & Request For Proposals
  • More...
    • Community
    • Elections
    • Planning & Development >
      • City Land
      • Community Planning
      • Community Branding
      • Economic Development
    • History
  • COVID-19

​Bayfield Street
​reconstruction project



Bayfield street reconstruction project

​The Wisconsin Department of Transportation and the City of Washburn are combining efforts to reconstruct Bayfield Street (Hwy 13), from Thompson Creek to Superior Ave.  Work will include utility replacement, road reconstruction and other items to be identified.  The anticipated construction will be from 2024-2027. 

 Public Meetings   
(At the Feb. 7, 2022 City Council Mtg.,
​Council approved the Option 3 Detour Route along with one stage of construction.)


January 26, 
 2022
The Wisconsin Department of Transportation and the City of Washburn will hold a public information session specific to the detour route for the Bayfield Street Reconstruction Project. 

This session will focus on current details of the Phase 1 portion of highway reconstruction from Thompson Creek to 2nd Ave W. 

During the October public meetings, two options for a detour route were presented.  These options were based on construction occurring in stages.  The DOT is suggesting a third option for detour with construction occurring all at once.  This will reduce the overall construction time. 

Location: The Club (3 W. Bayfield St.).
Jan. 26th - 6:00p-8:00p    
  • Detour Option 1
  • Detour Option 2
  • Detour Option 3
  • Detailed Map of Construction Route
  • Construction Staging
On-Line Link or Remote Participation
or Remote Call-In: 

888-788-0099 (toll-free call-in)
Mtg.ID:  840 2920 1772
Passcode:  193057
WisDOT Meeting New Release 1/11/22
File Size: 830 kb
File Type: pdf
Download File


We would like your feedback as we continue working with WisDOT.  Please click the button below to leave your comments.  
Public Input
​Scope of Work
Wisconsin DOT          
  • Phase 1 Project Scope Website
  • Reconstruct roadbed and place new pavement
  • New Curb & Gutter where needed​​
​​
​As the City and WisDOT prepare for this project, construction will occur in two phases.  Both phases will start at Washington Ave and work outward.  
 
​City of Washburn - Utility Upgrades
  • Water Main
  • Sanitary Sewer
  • Stormwater Sewer
  • Downtown Decorative Street Lights
  • To Be Determined: sidewalks, turn lanes
​
Picture



   Project Goals for 2021
  1. Discuss preparations with the Chamber, business and other property owners along the route that can be taken to allow access and traffic  to businesses during construction.
  2. Inspect the water and sewer lateral services to all properties along the construction route to determine which properties will be required  to replace laterals.
  3. Work with the Public and Wis DOT to determine the best detour routes for the community during the phases of the project, as well as scenarios for traffic flow.
  4. Plan for financing the overall project as well as addressing considerations for sidewalk replacement and street lighting.

​Phase 1  -  (Washington Ave to Thompson Creek)
  • Construction Zone between arrows on map, starting at Washington Ave and working west.  Detailed Map
  • Construction Staging - traffic patterns will change depending  on specific location of construction.
  • Anticipated time line:  April 2024 -  July 2025
Picture



​​Phase 2  -  (Washington Ave to Superior Ave)
  • Construction Zone between arrows on map, starting at Washington Ave and working east.
  • Detour traffic patterns will change depending on specific location of construction.
  • Anticipated time line:  April 2026 - Aug. 2027
Picture

This is the background of the Bottom Area shown below. It'll display correctly on published site.
If you don't want background for the bottom area, simply hover over the bottom of this image to delete it. The background of the bottom area will be a solid dark color.

CONTACT US
SITE DISCLAIMER
©2020 CITY OF WASHBURN. ALL RIGHTS RESERVED.
WEBSITE BY BIZY DOES IT